
CLASS A BURNBUILDING
The Commissioner by FireFacilities Inc. - 2009
- Two-Story Residential Side w/ Pitched Roof
- (2) 4x4 Holes for Ventilation Simulation
- Four-Story Rappel Tower with Invert Platform

MAYDAY SIMULATOR

LP GAS PROP
2012
- Elevated Control Building
- Vehicle Fire Prop; Gas Grill Prop; LP Gas Tank Prop
- slated to be completed in the Spring of 2012

COLLAPSE SITE
2010
- Concrete Rubble Pile
- Confined Space
- Double T's
- Cut Outs For Concrete Slabs and Appliances
- Shoring Window
- Raker Shore Wall

STORAGE BUILDING
2011
- 25'W x 50' L Three-sided Carport
- 26' W x 51' L x 4"D Concrete Pad
- Donated Metal Carport scheduled for assembly in January
- Will Provide Storage for Lull, Tractor, Training Engine

POWER LINE PROP
2011
- Erected by the Town of Bedford Electric Department
- Provides overhead obstruction for aerial ladder training
- Teaches identification of high voltage lines vs cable/phone lines

RESTROOMS
2013
- Concrete building donated by Lynchburg Crane
- Undergoing construction to be utilized as mens/womens restrooms